- Low Bay door was insulated
- Water Heater and Pressure Tank were relocated
- New High Volume Compressed Air will be installed
- Power Lines to the Compressor were installed
- Air line will be install to all areas of the Shop
- Major Shop Tools will be wired and placed
- High Volume Saw Dust Vacuum System will be installed
- Freeze Relocated
- A small Force Air Heater will be install in the High Bay (only to remove the chill while occupied)
- Install New Cabinets in Kitchen and Laundry
- Close Air Leaks at Window Step
My Amateur Radio Station and Other Project/Interests Blog
Home: http://WA0UWH.blogspot.com - Grid: CN88xc
Located Near Seattle in Puget Sound
and I Love to Build HomeBrew Ham Radio and many other interesting Projects
Local Pages
Showing posts with label Shop. Show all posts
Showing posts with label Shop. Show all posts
Saturday, November 19, 2011
Shop Work, While E Projects on Hold
The last few weeks I have not had much time for Ham Radio, Computers or Electronic projects. My Son and I have been working on building/Installing/updating new infrastructure for my Shop.
Tuesday, November 2, 2010
Shack and Shop Progress
The last few weeks I have been working on my Shack and Shop, and therefore very little time has been available to work on Electronic and Ham Radio projects.
The Shop wall insulation has been installed and covered, and major power distribution runs and breaker panels are complete. Power to the; Lathe, Mill, and Welders are connected, but the 3-Phase rotatory power converter is yet to be connected or installed (for the Drill-Mill). A new distribution power breaker panel is installed in the Shack (Loft), where there will be abundant power for my QRP Rigs :-)
Many storage shelves have been installed around the Machine Shop and the Electronic Shop. Now it is my task to unpack and organize the shelves contents.
More work and weather proofing is needed to close the gap at the bottom of the large Shop Doors. This winter the Shop should be a warm pleasant place to work on small or large projects.
In a few weeks, or so, my blog, e-projects and interests should be back to normal.
-
The Shop wall insulation has been installed and covered, and major power distribution runs and breaker panels are complete. Power to the; Lathe, Mill, and Welders are connected, but the 3-Phase rotatory power converter is yet to be connected or installed (for the Drill-Mill). A new distribution power breaker panel is installed in the Shack (Loft), where there will be abundant power for my QRP Rigs :-)
Many storage shelves have been installed around the Machine Shop and the Electronic Shop. Now it is my task to unpack and organize the shelves contents.
More work and weather proofing is needed to close the gap at the bottom of the large Shop Doors. This winter the Shop should be a warm pleasant place to work on small or large projects.
In a few weeks, or so, my blog, e-projects and interests should be back to normal.
-